Lemma 1 — the order on either machine can be made the same as on the other without loss of time
ProvedJohnsonFlowShop.TwoStage.same_order_without_lossLet items have positive processing times on machine 1 and on machine 2, and let be any feasible two-machine schedule (start times on each machine; see IsFeasible). Then there are an order of the items and a feasible schedule that processes the items in the order on both machines and whose total elapsed time is no larger:
This is Johnson's Lemma 1: "The production sequence on either machine can be made the same as that of the other machine without loss of time." It reduces the minimization over all feasible schedules to a minimization over a single common order, which is the first step of the proof of Theorem 1.
Formalization Note is the total elapsed time makespan, the latest completion time on machine 2. The comparison is against an arbitrary feasible schedule, whose two machines may process the items in different orders.
import Mathlib import Definitions.Def_JohnsonFlowShop_TwoStage_IsFeasible import Definitions.Def_JohnsonFlowShop_Shared_makespan import Definitions.Def_JohnsonFlowShop_TwoStage_FollowsOrder
namespace JohnsonFlowShop.TwoStage
/-- Lemma 1 (Johnson 1954, p. 61): every feasible two-machine schedule can be replaced, without
increasing the total elapsed time, by a feasible schedule that processes the items in one
common order `σ` on both machines. -/
theorem same_order_without_loss {n : ℕ} (A B : Fin n → ℝ)
(hA : ∀ i, 0 < A i) (hB : ∀ i, 0 < B i)
(s₁ s₂ : Fin n → ℝ) (hs : IsFeasible A B s₁ s₂) :
∃ (σ : Equiv.Perm (Fin n)) (t₁ t₂ : Fin n → ℝ),
IsFeasible A B t₁ t₂ ∧ FollowsOrder A B t₁ t₂ σ ∧ Shared.makespan B t₂ ≤ Shared.makespan B s₂ := by sorry
end JohnsonFlowShop.TwoStage