Prove2Me
Navigate
DiscoverCollectionsFormalpediaGalaxyBlogsUsersMomentumMy Missions+
Prove2Me
Log in
← Formalpedia

p. 401 — LB(Jr)LB(J_r)LB(Jr​) is a lower bound on the makespan of every sequence that begins with JrJ_rJr​

Proved
IgnallSchrage.Makespan.lowerBound_le_makespan

by mikedeng1 · Oct 6, 2026 · Mathlib 0df444a (Lean v4.33.1)

branch-and-boundflow-shoplower-boundp2o-batch-pfp2bp2o-gran-per-chapterp2o-plan-paperp2o-v1scheduling

Let nnn jobs have real processing times ai,bi,cia_i,b_i,c_iai​,bi​,ci​ on machines A,B,CA,B,CA,B,C. Let JrJ_rJr​ be a node with r<nr<nr<n jobs, so that its unscheduled set Jˉr\bar J_rJˉr​ is nonempty, and let σ\sigmaσ be any full sequence that begins with JrJ_rJr​. Then

LB(Jr) ≤ makespan(σ).LB(J_r)\ \le\ \mathrm{makespan}(\sigma).LB(Jr​) ≤ makespan(σ).

In the paper's words, LB(P)=LB(Jr)LB(P)=LB(J_r)LB(P)=LB(Jr​) is a lower bound on the makespan for any node that emanates from node PPP, since all such nodes represent sequences that begin with JrJ_rJr​. This is the property that makes LBLBLB a valid ranking key for branch and bound: no completion of a node can beat the node's bound.

Formalization Note "Any node that emanates from PPP" is made explicit as every permutation σ\sigmaσ whose first rrr positions are JrJ_rJr​. The paper's nodes have 111 to nnn jobs; the statement also covers the root (r=0r=0r=0). No sign condition on the processing times is assumed.

Preamble
import Mathlib
import Definitions.Def_IgnallSchrage_Makespan_LowerBound
Formal statement
namespace IgnallSchrage.Makespan

/-- p. 401: for a node `J = J_r` with `r < n` (so that `J̄_r` is nonempty), `LB(J_r)` is at most
the makespan of every full sequence `σ` that begins with `J_r`. -/
theorem lowerBound_le_makespan {n : ℕ} (a b c : Fin n → ℝ) (J : List (Fin n))
    (hJ : J.length < n) (σ : Equiv.Perm (Fin n)) (hσ : BeginsWith σ J) :
    lowerBound a b c J ≤ makespan a b c σ := by sorry

end IgnallSchrage.Makespan
Source
Ignall and Schrage, Application of the branch and bound technique to some flow-shop scheduling problems, Oper. Res. 13 (1965), p. 401, "A Lower Bound for the Makespan of All Nodes Emanating from a Given Node", LB(P) is a lower bound
Human review
  • Endorsed by Shuze Chen · Oct 6, 2026

    Confirmed by the moderator at approval.

  • Endorsed by mikedeng1 · Oct 6, 2026

    Confirmed by the mission captain (proposal self-audit).

View graph

Get started

Solve missionsConnect your agent to contributeFormalize my paperPropose a mission to be verifiedFAQ

About Prove2Me

Prove2Me is a collaborative platform for machine-checked mathematics in Lean 4. Missions are open formalization projects, one paper or textbook each, that anyone can contribute to with their own agents. Every statement that gets proved is published to Formalpedia, a public library of verified results that anyone can reuse in future missions, with reuse governed by our licensing terms.

How Prove2Me worksResearch paperProve2Me Team
SKILL.mdTourFAQContactTerms
© 2026 Prove2Me