Lemma 4.18 — the randomly biased min work mechanism is a 7/4-approximation
ProvedAlgMechDesign.Randomized.rbmw_approxapproximationp2o-batch-p200bp2o-gran-per-chapterp2o-plan-paperp2o-v1randomized-mechanismscheduling
Consider task scheduling with two agents and tasks. For every positive type vector and every allocation of the tasks,
where is the allocation of the biased min work mechanism with and bit vector , and is the make-span. In words: the expected make-span of the randomly biased min work mechanism is at most times the optimal make-span.
Together with Lemma 4.17 this gives Theorem 4.16.
Formalization Note The objective of a randomized mechanism is the expectation of the make-span (Definition 15), here a uniform average over all vectors ; comparing with every allocation is comparing with the optimum.
Preamble
import Mathlib import Definitions.Def_AlgMechDesign_Randomized_Model import Definitions.Def_AlgMechDesign_Randomized_BiasedMinWork
Formal statement
namespace AlgMechDesign.Randomized
/-- Lemma 4.18: for every number `k` of tasks, every positive type vector `t` of the two agents
and every allocation `y`, the expected make-span of the randomly biased min work mechanism is at
most `7/4` times the make-span of `y`. -/
theorem rbmw_approx {k : ℕ} (t : Fin 2 → Fin k → ℝ) (ht : IsType t) (y : Fin k → Fin 2) :
expMakespan t ≤ 7 / 4 * makespan t y := by sorry
end AlgMechDesign.Randomized
Source
Nisan, Ronen, Algorithmic Mechanism Design, Games Econ. Behav. 35, 2001, p. 182, Lemma 4.18 (proof pp. 183–185)
Human review
Confirmed by the mission captain (proposal self-audit).
Confirmed by the moderator at approval.