Existence of the least feasible cost level
ProvedMooreLateJobs.MaxDeferral.exists_ystarLet be a finite set of jobs with processing times and continuous non-decreasing deferral costs . For each let be a schedule of ordered by non-decreasing due-dates . Assume
- some level has without late jobs, and
- some level has with at least one late job.
Then there is such that
The level is the least cost level at which the due-date schedule is feasible; the main theorem shows that minimizes the maximum deferral cost.
Formalization Note Hypothesis 1 is the paper's footnote 3, which replaces boundedness ("It is sufficient if there exists such that has no late jobs"); this is the stronger of the paper's two versions, and the bounded version follows from the milestone bounded_exists_feasible_level. Hypothesis 2 is added: without it the statement is false (with all costs identically , for every , every is on time, and no has the second property). "For all " is read as , because is defined only for . is added.
import Mathlib import Definitions.Def_MooreLateJobs_Shared_completionTime import Definitions.Def_MooreLateJobs_MaxDeferral_NoLateAt
namespace MooreLateJobs.MaxDeferral
theorem exists_ystar {ι : Type*} [DecidableEq ι] (J : Finset ι) (t : ι → ℝ)
(P : ι → ℝ → ℝ) (ht : ∀ i ∈ J, 0 ≤ t i)
(hcont : ∀ i ∈ J, Continuous (P i)) (hmono : ∀ i ∈ J, Monotone (P i)) (SD : ℝ → List ι)
(hSD : ∀ y, 0 < y →
Shared.IsSchedule J (SD y) ∧ (SD y).Pairwise (fun a b => Pstar (P a) y ≤ Pstar (P b) y))
(hfeas : ∃ y₁, 0 < y₁ ∧ NoLateAt t P y₁ (SD y₁))
(hinf : ∃ y₀, 0 < y₀ ∧ ¬ NoLateAt t P y₀ (SD y₀)) :
∃ ystar, 0 < ystar ∧ NoLateAt t P ystar (SD ystar) ∧
∀ y, 0 < y → y < ystar → ¬ NoLateAt t P y (SD y) := by sorry
end MooreLateJobs.MaxDeferral