Theorem 1(i) — makespan reduces to maximum lateness
OpenSchedComplexity.Partition.Supplement.theorem_1icomplexity-theoryp2o-batch-supp500p2o-gran-per-chapterp2o-plan-paperp2o-v1polynomial-reductionsscheduling
For every fixed positive or variable machine count , shop type and admissible feature set without the deadline feature,
The paper specifies setting all due dates to zero; this data transformation is the definition zeroDueDates. The target uses signed maximum lateness. The exclusion of the deadline feature is the standing Section 3 rule that it is allowed only with makespan or weighted completion time, not an additional restriction on the stated family.
Differences from the source:
- encoding: recognition problems and polynomial-time reducibility with implicit finite input syntax → binary-coded languages over BSym and CookPvsNP polynomial-time many-one reductions; signed integer thresholds for maximum lateness and natural thresholds otherwise; reason: Sections 2–3 specify integer data and recognition questions; this fixes explicit bit syntax and retains negative lateness
- reading: the Section 3 family with ℓ specified only for m>1 and nonnegative operation counts → every label at m=1 is the one-operation single-machine problem; variable m ranges over positive counts; an empty operation list has B_j=C_j=0; reason: the single-machine boundary is explicitly included in 1(c),(k); the empty-list convention extends the published shop completion without imposing a new positivity assumption
- reading: λ may contain release and precedence features and their union is used in 1(g),(h) → release levels none < last < all and precedence levels none < tree < arbitrary; all bound and weight restrictions are conjunctive; reason: the proof of 1(g) calls the source a special case of the target, so a union of permissions takes the more general level
- encoding: λ in a schematic reduction between two criteria → Admissible for the target criterion, which rules out L_max≤0 and retains all positive bounds; reason: Section 3 expressly permits deadlines only for C_max and sumWC, so both sides must be defined
Preamble
import Mathlib import Definitions.Def_SchedComplexity_Partition_Supplement_Family
Formal statement
namespace SchedComplexity.Partition.Supplement
open CookPvsNP ProjSchedTW.Complexity
theorem theorem_1i (M : MachineCount) (hM : M.Valid) (ell : ShopKind)
(lam : Parameters) (hadm : Admissible lam .lmax) :
PolyReducible (language M ell lam .cmax) (language M ell lam .lmax) := by sorry
end SchedComplexity.Partition.Supplement
Source
Brucker, Lenstra & Rinnooy Kan, Complexity of Machine Scheduling Problems, Mathematisch Centrum Report BW 43/75 (1975), p. 9, Theorem 1(i)