Eq. (20): the RMS position error of an NPC is the RMS phase error over
ProvedArxiv2012_05254.npc_position_errorLet be the spacing of a baseline. Let the phase offset of its NPC be a random variable with finite variance, and let be the corresponding perpendicular offset of the NPC (eq. 8). Then
Formalization Note Only the exact first equality of eq. (20) is stated. The second relation, , is an approximation quoted from the literature for high signal-to-noise ratio. It is not stated.
import Mathlib import Definitions.Def_Arxiv2012_05254_Basic open MeasureTheory ProbabilityTheory open scoped RealInnerProductSpace
namespace Arxiv2012_05254
theorem npc_position_error {Ω : Type*} [MeasurableSpace Ω] (P : Measure Ω)
[IsProbabilityMeasure P] (u : Plane) (hu : u ≠ 0) (ψ : Ω → ℝ) (hψ : MemLp ψ 2 P) :
Real.sqrt (variance (fun ω => perpOffset u (ψ ω)) P) =
Real.sqrt (variance ψ P) / (2 * Real.pi * ‖u‖) := by sorry
end Arxiv2012_05254Read-back
What the Lean code literally says, in plain math · claude-opus-5-5
Let be an arbitrary measurable space and a probability measure on it. Let be a fixed, non-random vector (the "spacing") with , and its Euclidean norm. Let be a real random variable (a "phase offset") that is square-integrable with respect to . Square-integrable here means is almost-everywhere strongly measurable and
No other assumptions are placed on . It need not lie in any principal range such as , and it need not have any particular distribution.
The perpendicular offset of the line with spacing and phase offset is the real number
Because , the denominator is strictly positive, so the division-by-zero convention (which would give ) never applies. The composite random variable is therefore just scaled by the positive constant .
Variance means
This quantity is formally the real-number value of an extended-valued integral, with the convention that an infinite value becomes . The square-integrability hypothesis guarantees that the variance of , and hence of the scaled variable, is finite. The theorem asserts the exact equality of standard deviations:
In words: the standard deviation of the perpendicular offset equals the standard deviation of the phase offset divided by . This includes the degenerate case where is almost surely constant, in which case both sides equal .
Confirmed by the mission captain (proposal self-audit).
Confirmed by the moderator at approval.