Proof of Lemma 1, p. 30 — if i satisfies c_i ≤ (c_1+…+c_i)/(i−(1−3θ/2)) then so does i−1 (i ≥ 2); i = 1 always does
ProvedCoProdBundle.Equil.feasible_predbundlingclosed-form-equilibriump2o-batch-pfp2ap2o-gran-per-chapterp2o-plan-paperp2o-v1
Let , let , and let . Call feasible if
Then:
- is feasible;
- if is feasible, then is feasible.
Hence the feasible indices are exactly with the largest feasible index, which is why the maximum in (2a) determines the set of participating producers.
Formalization Note The paper writes "" and then proves the weak inequality; under equal costs only the weak one holds, and only the weak one is needed. Lean's producer k - 1 is the paper's producer .
Preamble
import Mathlib import Definitions.Def_CoProdBundle_Equil_Setting
Formal statement
namespace CoProdBundle.Equil
/-- Proof of Lemma 1, p. 30 (and p. 17): the first producer satisfies the condition of (2a), and
if the page's producer `k ≥ 2` satisfies it then so does `k − 1`. -/
theorem feasible_pred (I : ℕ) (hI : 0 < I) (c : Fin I → ℝ) (hc0 : ∀ i, 0 < c i)
(hcm : Monotone c) (θ : ℝ) (hθ0 : 0 < θ) (hθ1 : θ < 2 / 3) :
Feasible c θ 1 ∧ ∀ k : ℕ, 2 ≤ k → Feasible c θ k → Feasible c θ (k - 1) := by sorry
end CoProdBundle.Equil
Source
Bhargava, Bundling for Flexibility and Variety: An Economic Model for Multiproducer Value Aggregation, author's accepted manuscript (2020; Manag. Sci. doi:10.1287/mnsc.2020.3662), Appendix A.1, proof of Lemma 1, p. 30 (see also p. 17)
Human review
Confirmed by the mission captain (proposal self-audit).
Confirmed by the moderator at approval.