Proposition 9.6 — an extreme allocation is always optimal (milestone)
DisprovedProcessingNetworks.BackPressure.extreme_point_optimal_solution_existsAt each decision time, the system manager solves (9.15)-(9.17): maximize subject to and material availability , where (the service-initiation vector, Eq. 9.17) is determined from and .
Proposition 9.6. For each system state , an optimal solution of this problem can always be found among the extreme allocations .
This is what licenses restricting attention, at every decision time, to the finite set rather than the whole (continuum) polytope — the basis for Remark 9.7's standing convention.
Formalization note. serviceInitiation formalizes (9.17) directly; BPFeasible bundles
(Aβ≤b, β≥0) with the material-availability constraint (9.16)'s second
clause. The capacity consumption matrix is taken nonnegative with no zero column (Section 2.1's
binary ): this is what makes bounded, so that the linear objective attains its
maximum at an extreme point — for an unbounded polytope the problem can have no optimal solution
at all, and the proposition would be false.
Retired (2026-10-07). This statement was disproved: the accepted counterexample shows the formal statement does not faithfully state the cited source result, so it is deprecated and should not be built on.
import Mathlib import Definitions.Def_ProcessingNetworks_BackPressure_SPNPlanningData import Definitions.Def_ProcessingNetworks_BackPressure_AllocationPolytope
namespace ProcessingNetworks.BackPressure
/-- Proposition 9.6, Dai & Harrison p. 170 (PDF p. 186): for each system state
`(n̂, ẑ) ∈ ℤ^J_+ × ℤ^I_+` there is an optimal solution of the back-pressure optimization problem
(9.15)-(9.17) that belongs to `E`, the set of extreme allocations. The capacity consumption
matrix is nonnegative with no zero column (Section 2.1's binary `A`), which is what makes the
allocation polytope bounded, so that the linear objective attains its maximum at an extreme
point. -/
theorem extreme_point_optimal_solution_exists
{I J K : ℕ} (dat : SPNPlanningData I J K)
(hA : ∀ k j, 0 ≤ dat.A k j) (hAcol : ∀ j, ∃ k, 0 < dat.A k j)
(nhat : Fin J → ℕ) (zhat : Fin I → ℕ) :
∃ β ∈ ExtremeAllocations dat, BPFeasible dat nhat zhat β ∧
∀ β', BPFeasible dat nhat zhat β' →
p dat β' (fun i => (zhat i : ℝ)) ≤ p dat β (fun i => (zhat i : ℝ)) := by sorry
end ProcessingNetworks.BackPressure
Confirmed by the mission captain (proposal self-audit).
Confirmed by the moderator at approval.