p. 138 — worked example: and (printed 0.1485)
ProvedSherbrookeMetric.PointEstimate.worked_examplebackordersinventoryp2o-batch-pfp2bp2o-gran-per-chapterp2o-plan-paperp2o-v1poisson
Let be the expected backorders at spare stock under Poisson demand with mean . Take spare stock .
- With the point estimate of mean demand,
- If instead the mean demand is or with probability each (so its mean is still ), the expected backorders
satisfy .
This is the numerical example of Sherbrooke (1968), p. 138, which illustrates that the point estimate understates expected backorders ().
Formalization Note The paper prints . The exact value is , which rounds (and truncates) to ; the statement uses the corrected four-digit value. The paper's sums start at ; the term is zero, so they agree with eq. (2)'s .
Preamble
import Mathlib import Definitions.Def_SherbrookeMetric_PointEstimate_backorders
Formal statement
namespace SherbrookeMetric.PointEstimate
/-- Sherbrooke (1968), p. 138, the worked example: `B(2 | 1) = 3e^{-1} - 1 ≈ 0.1036`, and the
backorders under the two-point prior `{0.5, 1.5}` with weights `0.5, 0.5` are
`B*(2) = 0.5 B(2 | 0.5) + 0.5 B(2 | 1.5) ≈ 0.1486` (printed `0.1485`, a rounding slip). -/
theorem worked_example :
backorders 2 1 = 3 * Real.exp (-1) - 1 ∧
|backorders 2 1 - 0.1036| < 0.00005 ∧
|(0.5 * backorders 2 0.5 + 0.5 * backorders 2 1.5) - 0.1486| < 0.00005 := by sorry
end SherbrookeMetric.PointEstimate
Source
Sherbrooke, METRIC: A Multi-Echelon Technique for Recoverable Item Control, Oper. Res. 16 (1968), p. 138, Demand Prediction (worked example)
Human review
Confirmed by the mission captain (proposal self-audit).
Confirmed by the moderator at approval.