Theorem 4.5, duality bound:
ProvedValuativeSYZ.thm_4_5_kantorovich_boundTheorem 4.5, duality bound. The non-archimedean Monge–Ampère equation is the Kantorovich dual of an optimal transport problem between the essential skeleton, carrying the measure , and the space of limiting tropical theta functions, carrying the measure built from the Lebesgue measure of the Okounkov body: the solution restricted to the skeleton is the minimiser of
This milestone records the inequality that makes a dual functional, which is the elementary half of the duality: from the definition of the -transform one has pointwise, hence for every coupling of and ,
So every admissible potential gives an upper bound for the transport cost of every coupling; the hard half, that the bound is attained by the Monge–Ampère solution, is not part of this milestone.
import Mathlib import Definitions.Def_ValuativeSYZ_cost_transform import Definitions.Def_ValuativeSYZ_degeneration set_option autoImplicit false open MeasureTheory
namespace ValuativeSYZ
/-- **Theorem 4.5, duality bound.** For every bounded measurable potential `φ` and every
coupling `π` of the measures `μ` on the skeleton and `ν` on the parameter space, the transport
cost of `π` is dominated by the value `∫ φᶜ dν + ∫ φ dμ` of the functional `F_μ` at `φ`. -/
theorem thm_4_5_kantorovich_bound {X B : Type*} [MeasurableSpace X] [MeasurableSpace B]
[Nonempty X] (c : X → B → ℝ) (M : ℝ) (hc : ∀ x p, |c x p| ≤ M)
(hcmeas : Measurable fun z : X × B => c z.1 z.2)
(φ : X → ℝ) (hφ : ∀ x, |φ x| ≤ M) (hφmeas : Measurable φ)
(htmeas : Measurable (ctransform c φ))
(μ : Measure X) (ν : Measure B) (π : Measure (X × B))
[IsProbabilityMeasure μ] [IsProbabilityMeasure ν] [IsProbabilityMeasure π]
(hπ₁ : π.map Prod.fst = μ) (hπ₂ : π.map Prod.snd = ν) :
∫ z, c z.1 z.2 ∂π ≤ (∫ p, ctransform c φ p ∂ν) + ∫ x, φ x ∂μ := by sorry
end ValuativeSYZRead-back
What the Lean code literally says, in plain math · self-authored by the drafting agent (non-blind; no independent auditor)
Disclosure — this read-back is NOT blind and is NOT independent testimony. It was written by the same agent that drafted the Lean statement it describes, not by a separate auditor working from the code alone. The usual safeguard — an auditor who has never seen the intended meaning, the source paper, or the mission pitch — was therefore not in place, so this text cannot corroborate the formalization: an error of understanding in the drafting would be reproduced here unchanged. Please read it as an annotated restatement by the author, and audit the Lean code directly.
The statement is quantified over two types and , each with a measurable structure and no topology, with assumed non-empty; a function ; a real number ; a function ; and three measures on , on and on the product , each assumed to be a probability measure.
The hypotheses are: for all , ; the map is measurable on the product; for all (the same ); is measurable; the function is measurable; and has marginals and , in the sense that the pushforward of along the first projection equals and the pushforward along the second projection equals .
The conclusion is the inequality of Bochner integrals
Integrability is not assumed as a separate hypothesis; the integrals are the total ones, which are defined for every function and take the value for a non-integrable integrand, so the hypotheses of boundedness and measurability together with finiteness of the measures are what make each integral the expected finite quantity.