§6.7.1, p. 74 — signs of the transfer rates; t_B ranges over [−β_s, β_r)
ProvedCachonCoord.BaseStock.p74_transfer_signscoordinationinventoryp2o-batch-pfp2ap2o-gran-per-chapterp2o-plan-bookp2o-v1supply-chain
In the single-location base-stock model with holding cost rate and backorder cost rates , , consider the contracts of Eq. (33): for the supplier pays the retailer at the rates
per unit of expected inventory and per unit of expected backorders. Then:
- for every , , and exactly when (the supplier subsidizes the retailer's holding cost);
- as ranges over , takes exactly the values in ;
- some contract in the family has , i.e. the supplier subsidizes the retailer's backorders.
The result describes which way money flows under the coordinating contracts: the inventory term is never a penalty, while the backorder term can be either a penalty or a subsidy.
Formalization Note The page says the conjecture "is valid when "; at the printed formula gives , so the statement here is with strict positivity exactly for . Positive rates are payments from the supplier to the retailer, as on p. 73.
Preamble
import Mathlib import Definitions.Def_CachonCoord_BaseStock_Model open MeasureTheory ProbabilityTheory
Formal statement
namespace CachonCoord.BaseStock
/-- Cachon (2003), §6.7.1, p. 74, the paragraph after (33): signs of the transfer rates
`t_I = (1 - λ)h_r` and `t_B = β_r - λβ` over the family `λ ∈ (0, 1]`.
The inventory subsidy is nonnegative and strictly positive exactly when `λ < 1`
(the page's "t_I > 0 … valid when λ ∈ (0, 1]" fails at `λ = 1`, where `t_I = 0`);
the backorder rates fill exactly `[-β_s, β_r)`, and some contract has `t_B > 0`. -/
theorem p74_transfer_signs (M : Model) :
(∀ lam : ℝ, 0 < lam → lam ≤ 1 → 0 ≤ M.tI lam ∧ (0 < M.tI lam ↔ lam < 1)) ∧
M.tB '' Set.Ioc 0 1 = Set.Ico (-M.bs) M.br ∧
∃ lam : ℝ, 0 < lam ∧ lam ≤ 1 ∧ 0 < M.tB lam := by sorry
end CachonCoord.BaseStock
Source
Cachon (2003), Supply Chain Coordination with Contracts, 3rd draft (Jan. 2003), §6.7.1, paragraph after Eq. (33), p. 74
Human review
Confirmed by the mission captain (proposal self-audit).
Confirmed by the moderator at approval.