Proof of Proposition 3.4.2 — G has a cut of M edges iff the constructed instance has a 0/1 schedule of deviation ≥ M
ProvedProjSchedTW.Complexity.maxCut_iff_stableSchedulemax-cutp2o-batch-b23bp2o-gran-per-chapterp2o-plan-bookp2o-v1project-schedulingtime-constrained-scheduling
Let be a simple graph on and . Build the instance of with , for , minimum time lags and for , , and if and are adjacent in , otherwise. Then has a cut with at least edges if and only if there is a time-feasible schedule with for all and
This is the correctness of the transformation from SIMPLE MAX CUT in the proof of Proposition 3.4.2; the book calls such a schedule stable.
Formalization Note Node of (Fin ν) is activity . The deadline is part of time-feasibility. "A cut containing edges" is read as "at least edges", the SIMPLE MAX CUT question.
Preamble
import Mathlib import Definitions.Def_ProjSchedTW_Complexity_Encoding import Definitions.Def_ProjSchedTW_Complexity_TimeConstrained
Formal statement
namespace ProjSchedTW.Complexity
/-- Proof of Proposition 3.4.2 (p. 241): `G` has a cut with at least `M` edges iff the
constructed instance has a time-feasible schedule with `S_i ∈ {0, 1}` for all `i ∈ V^G` and
`∑_{i ∈ V} ∑_{j ∈ V, j > i} w_ij |S_j − S_i| ≥ M`. -/
theorem maxCut_iff_stableSchedule {ν : ℕ} (G : SimpleGraph (Fin ν)) (M : ℕ) :
MaxCutYes G M ↔
∃ S, (maxCutProject G M).TimeFeasible S ∧
(∀ i : Fin (ν + 2), i ≠ 0 → i ≠ Fin.last (ν + 1) → S i = 0 ∨ S i = 1) ∧
(M : ℝ) ≤ (maxCutProject G M).deviation S := by sorry
end ProjSchedTW.Complexity
Source
Neumann, Schwindt & Zimmermann, Project Scheduling with Time Windows and Scarce Resources, 2nd ed., Springer 2003, p. 241, proof of Proposition 3.4.2 (transformation from SIMPLE MAX CUT)
Human review
Confirmed by the mission captain (proposal self-audit).
Confirmed by the moderator at approval.