Theorem 6.1 (b) — a stochastic quasi-Féjer sequence for a nonempty set has accumulation points a.s.
ProvedNumStochOpt.QuasiFejer.theorem_6_1_b_accumulation_points_nonemptymartingalesp2o-batch-b23ap2o-gran-per-chapterp2o-plan-bookp2o-v1stochastic-optimizationstochastic-quasigradient
Let be a stochastic quasi-Féjer sequence (Eq. (6.14)) for a nonempty set on a probability space . Then for almost every the set of accumulation points of the sequence , , is not empty.
Together with part (c), this is how Theorem 6.1 turns into convergence of an algorithm: once one accumulation point is shown to lie in , the whole sequence converges.
Formalization Note The book does not state , but the definition is vacuous for (then any sequence is quasi-Féjer, including ), so the hypothesis is required and added. An accumulation point is a cluster point of along atTop (MapClusterPt). The book cites the proof to [5, p. 98].
Preamble
import Mathlib import Definitions.Def_NumStochOpt_QuasiFejer_ProjectionMethod import Definitions.Def_NumStochOpt_QuasiFejer_StochQuasiFejer open MeasureTheory Filter Topology open scoped InnerProductSpace ENNReal
Formal statement
namespace NumStochOpt.QuasiFejer
/-- **Theorem 6.1 (b)** (Ermoliev, Ch. 6 of Ermoliev & Wets (1988), p. 144, citing [5, p. 98]).
If `{z^s}` is a stochastic quasi-Féjer sequence for a nonempty set `Z`, then for almost every
outcome `ω` the sequence `z^s(ω)` has at least one accumulation point. -/
theorem theorem_6_1_b_accumulation_points_nonempty {Ω : Type*} [MeasurableSpace Ω] {n : ℕ}
(μ : Measure Ω) [IsProbabilityMeasure μ]
(z : ℕ → Ω → EuclideanSpace ℝ (Fin n)) (Z : Set (EuclideanSpace ℝ (Fin n)))
(hZ : Z.Nonempty) (hz : IsStochQuasiFejer μ z Z) :
∀ᵐ ω ∂μ, ∃ a : EuclideanSpace ℝ (Fin n), MapClusterPt a atTop (fun s => z s ω) := by sorry
end NumStochOpt.QuasiFejer
Source
Yu. Ermoliev, "Stochastic Quasigradient Methods", in Ermoliev & Wets (eds.), Numerical Techniques for Stochastic Optimization, Springer 1988, Ch. 6, p. 144, Theorem 6.1 (b)
Human review
Confirmed by the mission captain (proposal self-audit).
Confirmed by the moderator at approval.