Corollary 1: FS has a non-preemptive schedule with finish time iff has a partition
ProvedFlowJobShop.PartitionFlow.corollary_1flow-shopnp-completenessp2o-batch-pfp2bp2o-gran-per-chapterp2o-plan-paperp2o-v1reductionscheduling
Let , and FS be as in the proof of Lemma 1. Then
The paper states Corollary 1 as "Partition non-preemptive FOFT with and at most two nonzero tasks per job"; its proof says that the construction of Lemma 1 yields a flow shop with a non-preemptive schedule of finish time iff has a partition. That equivalence, with "finish time " as in the definition of FOFT, is what is formalized.
Formalization Note A non-preemptive schedule is a schedule with at most one piece per task. Polynomial-time reducibility is not formalized.
Preamble
import Mathlib import Definitions.Def_FlowJobShop_PartitionFlow_FlowShop import Definitions.Def_FlowJobShop_PartitionFlow_Partition import Definitions.Def_FlowJobShop_PartitionFlow_Instance open FlowJobShop.PartitionFlow.FlowShop
Formal statement
namespace FlowJobShop.PartitionFlow
/-- Corollary 1 (Gonzalez–Sahni 1978, pp. 39–40), in the form its proof establishes: the flow
shop FS of Lemma 1 has a non-preemptive schedule with finish time `≤ τ = 2T` iff
`S = {a_1, …, a_n}` has a partition. -/
theorem corollary_1 {n : ℕ} (a : Fin n → ℕ) :
(∃ S : PreemptiveSchedule (FS a), S.IsNonPreemptive ∧ S.finishTime ≤ 2 * T a) ↔
HasPartition a := by sorry
end FlowJobShop.PartitionFlow
Source
Gonzalez, Sahni, Flowshop and Jobshop Schedules: Complexity and Approximation, Operations Research 26(1) (1978), p. 39, Corollary 1 (proof pp. 39–40)
Human review