Lemma 2.3 — for frequencies , the sets and contain disjoint time intervals
ProvedFlowJobHardness.FlowShopGap.lemma_2_3flow-shopjob-shoplower-boundmakespanp2o-batch-pfp2bp2o-gran-per-chapterp2o-plan-paperp2o-v1
Let and be natural numbers and let be a feasible schedule of the flow shop instance . Let be a machine group and let be frequencies with . Then every interval of is disjoint from every interval of :
Here is the set of first halves of the good long-operations on machine .
Together with the disjointness of operations on one machine, the lemma shows that the first halves of all good long-operations in one machine group are pairwise disjoint, so their total length is at most the makespan.
Formalization Note The paper's proof uses , which holds for ; this is the threshold . The lemma needs no assumption on the makespan.
Preamble
import Mathlib import Definitions.Def_JobShopLTAS_Core_Instance import Definitions.Def_FlowJobHardness_FlowShopGap_Construction import Definitions.Def_FlowJobHardness_FlowShopGap_GoodOps open JobShopLTAS.Core
Formal statement
namespace FlowJobHardness.FlowShopGap
/-- Lemma 2.3 (p. 20:10): in every feasible schedule of `F(r, d)` (`r ≥ 3`), for every
machine group `g` and frequencies `1 ≤ k < ℓ ≤ d`, every interval of `T_{g,k}` is disjoint
from every interval of `T_{g,ℓ}`. -/
theorem lemma_2_3 (r d : ℕ) (hr : 3 ≤ r) (s : (inst r d).Op → ℝ)
(hs : (inst r d).IsFeasibleSchedule Finset.univ s)
(g : ℕ) (hg1 : 1 ≤ g) (hg2 : g ≤ r ^ (2 * d))
(k ℓ : ℕ) (hk : 1 ≤ k) (hkℓ : k < ℓ) (hℓ : ℓ ≤ d) :
∀ I ∈ T r d s g k, ∀ J ∈ T r d s g ℓ, Disjoint I J := by sorry
end FlowJobHardness.FlowShopGap
Source
Mastrolilli, Svensson, Hardness of Approximating Flow and Job Shop Scheduling Problems, J. ACM 58(5) (2011), Article 20, p. 20:10, Lemma 2.3 (proof on pp. 20:10-20:11)