Lemma 10, p. 22 — E[(X − µ)^+] ≤ µ√∆/2 (∆ ≤ 1) and ≤ µ∆/(∆+1) (∆ ≥ 1)
ProvedGreedWorks.OnlineTime.lemma_10coefficient-of-variationp2o-batch-pfp2ap2o-gran-per-chapterp2o-plan-paperp2o-v1positive-partprobability-inequality
Let be a nonnegative random variable with finite second moment and mean , and let be its squared coefficient of variation. Then
Equivalently ; this is how the delay a job can cause beyond its mean is controlled in the stochastic analysis.
Formalization Note The squared coefficient of variation is undefined at , so is assumed. . A finite second moment makes the variance finite.
Preamble
import Mathlib
Formal statement
namespace GreedWorks.OnlineTime
open MeasureTheory ProbabilityTheory
/-- Lemma 10 (p. 22). Let `X ≥ 0` be a random variable with finite second moment and mean
`μ = 𝔼[X] > 0`, and let `Δ = Var[X]/μ²` be its squared coefficient of variation. Then
`𝔼[(X − μ)⁺] ≤ μ √Δ / 2` if `Δ ≤ 1`, and `𝔼[(X − μ)⁺] ≤ μ Δ / (Δ + 1)` if `Δ ≥ 1`. -/
theorem lemma_10 {Ω : Type*} [MeasurableSpace Ω] (Pr : Measure Ω) [IsProbabilityMeasure Pr]
(X : Ω → ℝ) (hX0 : ∀ ω, 0 ≤ X ω) (hX : MemLp X 2 Pr) (hμ : 0 < ∫ ω, X ω ∂Pr) :
(variance X Pr / (∫ ω, X ω ∂Pr) ^ 2 ≤ 1 →
∫ ω, max (X ω - ∫ ω', X ω' ∂Pr) 0 ∂Pr ≤
(∫ ω, X ω ∂Pr) * Real.sqrt (variance X Pr / (∫ ω, X ω ∂Pr) ^ 2) / 2) ∧
(1 ≤ variance X Pr / (∫ ω, X ω ∂Pr) ^ 2 →
∫ ω, max (X ω - ∫ ω', X ω' ∂Pr) 0 ∂Pr ≤
(∫ ω, X ω ∂Pr) * (variance X Pr / (∫ ω, X ω ∂Pr) ^ 2) /
(variance X Pr / (∫ ω, X ω ∂Pr) ^ 2 + 1)) := by sorry
end GreedWorks.OnlineTime
Source
Gupta, Moseley, Uetz & Xie, Greed Works – Online Algorithms For Unrelated Machine Stochastic Scheduling, arXiv:1703.01634v4, p. 22, Appendix A, Lemma 10, (20)
Human review
Confirmed by the mission captain (proposal self-audit).
Confirmed by the moderator at approval.