(2.17) — the bound combining (2.11), (2.12), (2.16) and Assumption 1
ProvedKLTNuclear.Oracle.eq_2_17matrix-estimationnuclear-normoracle-inequalityp2o-batch-pfp2bp2o-gran-per-chapterp2o-plan-paperp2o-v1
Work in the trace regression model with square-integrable design entries and integrable responses. Let be a convex set of matrices satisfying Assumption 1 with constant ( for ), let , and fix a realization of the sample at which minimizes over ; let . For every with singular value decomposition and support , with
one has
It is the last intermediate inequality of the proof of Theorem 1 before the fast-rate bounds (2.4) and (2.5).
Formalization Note is the square root of . Model hypothesis in conditional-expectation form; integrability conditions added; independence not assumed.
Preamble
import Mathlib import Definitions.Def_KLTNuclear_Oracle_Model open MeasureTheory MatrixCompletion
Formal statement
namespace KLTNuclear.Oracle
/-- (2.17) (p. 9): for a convex 𝔸 under Assumption 1 with constant μ, every A ∈ 𝔸 with
support (S₁, S₂), Λ = 2‖𝒫_A(𝐌)‖₂ and Γ = 2‖P_{S₁⊥} 𝐌 P_{S₂⊥}‖∞. -/
theorem eq_2_17 {Ω : Type*} [MeasurableSpace Ω] {P : Measure Ω} [IsProbabilityMeasure P]
{n m₁ m₂ : ℕ} (hn : 0 < n)
(X : Fin n → Ω → RealMatrix m₁ m₂) (Y : Fin n → Ω → ℝ)
(hreg : SampleRegularity P X Y)
(A₀ : RealMatrix m₁ m₂) (hmodel : TraceRegressionModel P X Y A₀)
(𝔸 : Set (RealMatrix m₁ m₂)) (h𝔸 : Convex ℝ 𝔸) (μ : ℝ) (hμ : Assumption1 P X 𝔸 μ)
(lam : ℝ) (hlam : 0 < lam)
(ω : Ω) (Ahat : RealMatrix m₁ m₂) (hAhat : IsEstimator P X Y lam ω 𝔸 Ahat) :
∀ A ∈ 𝔸, ∀ (r : ℕ) (S : SVD A r),
l2NormSq P X (Ahat - A₀) + l2NormSq P X (Ahat - A) + lam * nuclearNorm (normalProjection S Ahat) ≤
l2NormSq P X (A - A₀) +
μ * (lam * Real.sqrt (A.rank : ℝ) +
2 * frobeniusNorm (tangentProjection S (noiseMatrix P X Y ω))) * l2Norm P X (Ahat - A) +
2 * spectralNorm (normalProjection S (noiseMatrix P X Y ω)) *
nuclearNorm (normalProjection S Ahat) := by sorry
end KLTNuclear.Oracle
Source
Koltchinskii, Lounici, Tsybakov, Nuclear-Norm Penalization and Optimal Rates for Noisy Low-Rank Matrix Completion, arXiv:1011.6256v4, p. 9, (2.17)
Human review
Confirmed by the mission captain (proposal self-audit).
Confirmed by the moderator at approval.