Theorem 1(f) — flow shop reduces to general job shop
OpenSchedComplexity.Partition.Supplement.theorem_1fcomplexity-theoryp2o-batch-supp500p2o-gran-per-chapterp2o-plan-paperp2o-v1polynomial-reductionsscheduling
For any fixed positive or variable machine count , any admissible feature set and any of the five criteria ,
This is the flow-shop to job-shop special-case relation. No restriction to makespan, to empty features, or to fixed machine counts is imposed; no-wait and bounded-operation features are included when present.
Differences from the source:
- encoding: recognition problems and polynomial-time reducibility with implicit finite input syntax → binary-coded languages over BSym and CookPvsNP polynomial-time many-one reductions; signed integer thresholds for maximum lateness and natural thresholds otherwise; reason: Sections 2–3 specify integer data and recognition questions; this fixes explicit bit syntax and retains negative lateness
- reading: the Section 3 family with ℓ specified only for m>1 and nonnegative operation counts → every label at m=1 is the one-operation single-machine problem; variable m ranges over positive counts; an empty operation list has B_j=C_j=0; reason: the single-machine boundary is explicitly included in 1(c),(k); the empty-list convention extends the published shop completion without imposing a new positivity assumption
- reading: λ may contain release and precedence features and their union is used in 1(g),(h) → release levels none < last < all and precedence levels none < tree < arbitrary; all bound and weight restrictions are conjunctive; reason: the proof of 1(g) calls the source a special case of the target, so a union of permissions takes the more general level
Preamble
import Mathlib import Definitions.Def_SchedComplexity_Partition_Supplement_Family
Formal statement
namespace SchedComplexity.Partition.Supplement
open CookPvsNP ProjSchedTW.Complexity
theorem theorem_1f (M : MachineCount) (hM : M.Valid) (lam : Parameters)
(k : Criterion) (hadm : Admissible lam k) :
PolyReducible (language M .flow lam k) (language M .general lam k) := by sorry
end SchedComplexity.Partition.Supplement
Source
Brucker, Lenstra & Rinnooy Kan, Complexity of Machine Scheduling Problems, Mathematisch Centrum Report BW 43/75 (1975), p. 9, Theorem 1(f)