Theorem 5(a) — G has a Hamilton path iff the no-wait flow shop has C_max ≤ (n − 1)(μ + 2λ) + mμ
ProvedSchedComplexity.NoWait.theorem_5a_equivhamilton-pathno-waitnp-completenessp2o-batch-pfp2bp2o-gran-per-chapterp2o-plan-paperp2o-v1scheduling
Let be a directed graph with , , an admissible assignment, and , . Consider the instance of the construction of Theorem 5. Then has a Hamilton path if and only if this instance has a feasible schedule with
This is the correctness of the reduction in Theorem 5(a).
Formalization Note is stated as for every job. The threshold is computed in ; at , truncates to , and both sides hold there. For the hypothesis on cannot be met, so the statement says nothing about .
Preamble
import Mathlib import Definitions.Def_SchedComplexity_NoWait_DirectedGraphs import Definitions.Def_SchedComplexity_NoWait_Construction
Formal statement
namespace SchedComplexity.NoWait
/-- Theorem 5(a), the equivalence (p. 25): for an admissible `ι`, `λ ≥ 1` and `μ ≥ 2λ + 3`, the
directed graph `adj` on `n` vertices has a Hamilton path iff the constructed
`n|m|F,no wait|C_max` instance (`m = n(n−1)+2`) has a feasible schedule with
`C_max ≤ (n − 1)(μ + 2λ) + mμ`. -/
theorem theorem_5a_equiv {n : ℕ} (adj : Fin n → Fin n → Bool) (ι : Fin n → Fin n → ℕ)
(hι : Admissible n ι) (lam mu : ℕ) (hlam : 1 ≤ lam) (hmu : 2 * lam + 3 ≤ mu) :
HasHamiltonPath adj ↔
∃ B, IsNoWaitSchedule (procTimes adj ι lam mu) B ∧
∀ ℓ, completion (procTimes adj ι lam mu) B ℓ ≤
(n - 1) * (mu + 2 * lam) + numMachines n * mu := by sorry
end SchedComplexity.NoWait
Source
Brucker, Lenstra & Rinnooy Kan, Complexity of Machine Scheduling Problems, Mathematisch Centrum Report BW 43/75 (1975), p. 25, proof of Theorem 5(a)
Human review
Confirmed by the mission captain (proposal self-audit).
Confirmed by the moderator at approval.