Proposition 5, p. 18 — T* is feasible, CS-free when customers gain, and optimal within T3 when the smallest-demand tier does not adopt
ProvedSolarTariff.Fair.proposition_5Fix a finite market satisfying the model's standing assumptions and a nonempty target adopting set with . Construct from that target. Proposition 5 asserts three conclusions:
- At price , induces exactly ; the solar company earns and strictly less at every other real price; and the utility's profit change is .
- If , the maximum increase in any tier's customer cash outflow is at most zero, so the outcome is free of cross-subsidization.
- If and some tier with the smallest demand does not adopt, minimizes that maximum cash-outflow increase among all feasible tariffs of type , allowing each competitor its own solar price.
The result gives a tiered tariff that implements the desired adoption outcome while meeting the solar firm's and utility's profit targets, with the stated equity and optimality guarantees.
Formalization Note The standing predicate makes explicit so the paper's denominators are nonzero. The paper's threshold ordering is replaced by the induced equilibrium, including the unique solar-company best response; ties favor adoption. The optimality comparison ranges over tariffs as in §4.3, and a minimal-demand nonadopting tier may be any one of several tied minima. The printed slips in (16), (17), (19), and the p. 12 customer-gain formula are resolved using the paper's surrounding derivation and proof.
import Mathlib import Definitions.Def_SolarTariff_Fair_Model
namespace SolarTariff.Fair
theorem proposition_5 {ι : Type*} [Fintype ι] [DecidableEq ι] [Nonempty ι]
(M : Market ι) (hM : M.Standing) (A : Finset ι)
(hA : Admissible M A) :
let B := (TStar M A).bills M
FeasibleP2 M A B (tm M A) ∧
(0 ≤ dC M A → objective M B A (tm M A) ≤ 0) ∧
(0 ≤ dC M A → (∃ k, k ∉ A ∧ ∀ i, M.d k ≤ M.d i) →
∀ (τ : T3 ι) (ps : ℝ), FeasibleP2 M A (τ.bills M) ps →
objective M B A (tm M A) ≤ objective M (τ.bills M) A ps) := by sorry
end SolarTariff.Fair
Confirmed by the mission captain (proposal self-audit).
Confirmed by the moderator at approval.