Due Arrears Boundary
ProvedActuarialAnnuities.due_arrears_boundaryactuarial-scienceannuity-cashflowsingle-life-annuitiestiming
Finite due-minus-arrears difference includes the contingent terminal arrears payment.
Mathematical relation:
Timing and admissibility conditions are the exact conditions of the declaration. Cash amounts are per instalment and present values are at valuation time zero.
Preamble
import Mathlib.Data.Real.Basic import Mathlib.Algebra.BigOperators.Group.Finset.Basic import Definitions.Def_actuarial_bTotal import Definitions.Def_actuarial_bSurvival import Definitions.Def_actuarial_bExpectedPV import Definitions.Def_actuarial_bLevel
Formal statement
namespace ActuarialAnnuities theorem due_arrears_boundary (h : ℕ) (v : ℝ) (p : ℕ → ℝ) (hp : bTotal h p = 1) : bExpectedPV h 0 h 0 0 v (bLevel 1) p-bExpectedPV h 0 h 0 1 v (bLevel 1) p = 1-v^h*bSurvival h p h := by sorry end ActuarialAnnuities
Source
Original derived finite-cashflow result, contextual source page 148, Immediate life annuities (Chapter 5, section 5.4.3). D. C. M. Dickson, M. R. Hardy and H. R. Waters (2020), Actuarial Mathematics for Life Contingent Risks, third edition, Cambridge University Press. https://www.cambridge.org/highereducation/books/actuarial-mathematics-for-life-contingent-risks/281DA4E8D523A6B23280ADC3D165AFDA/contents/4EB4E907782E2CD9CF0447D8F5DF1F6E. The cited page identifies the surrounding topic, not a numbered theorem with this exact Lean signature.
Human review
Confirmed by the mission captain (proposal self-audit).
Confirmed by the moderator at approval.