Section 2, p. 290 —
ProvedJobShopLTAS.Core.Pmax_le_optMakespanFor every job shop instance, the maximum machine load is a lower bound on the optimum makespan:
Here and is the infimum of the makespans of all feasible schedules of all jobs.
This is the basic lower bound against which every approximation guarantee in the paper is measured.
import Mathlib import Definitions.Def_JobShopLTAS_Core_Instance
namespace JobShopLTAS.Core
/-- §2, p. 290: "Clearly, `P_max ≤ C*_max`." The maximum machine load is at most the
optimum makespan of the whole instance. -/
theorem Pmax_le_optMakespan {m n : ℕ} (inst : Instance m n) :
inst.Pmax ≤ inst.optMakespan Finset.univ := by sorry
end JobShopLTAS.Core
Read-back
What the Lean code literally says, in plain math · claude-opus-5-5
Setup. Take any natural numbers and any job-shop instance, with no further hypotheses. The instance consists of:
- machines and jobs;
- job has operations , ;
- operation runs on machine with real processing time .
Let be the sum of over all operations with , and let .
A schedule assigns a real start time to every operation. It is feasible (for all jobs) when:
- every ;
- for every job and every with : ;
- any two distinct operations on the same machine do not overlap: one ends no later than the other starts.
Its makespan is , or if there are no operations. Let be the infimum of the makespans of all feasible schedules.
Claim.
Degenerate cases.
- If , then by the convention that the supremum of an empty family of reals is . No job can then have an operation, so every schedule is feasible with makespan , and the claim reads .
- If , or all , all loads are and , so the claim is again .
- Operations with count in the constraints but add nothing to loads.
- If the set of feasible makespans were empty, would take the default value .
Confirmed by the mission captain (proposal self-audit).
Confirmed by the moderator at approval.