The schedule is feasible for the extended problem (E)
ProvedDelayedSWPT.Extended.piE_feasibleonline-algorithmsp2o-batch-pfp1ap2o-gran-per-chapterp2o-plan-paperp2o-v1scheduling
Let be the Delayed SWPT schedule of an instance (P), and let be the schedule of the extended problem (E) that starts each original job at and each gap job at its gap time . Then is a feasible nonpreemptive schedule of (E): every job of starts no earlier than its release date in (E), and no two jobs overlap.
The optimality of for (E) is then a statement about a feasible schedule.
Preamble
import Mathlib import Definitions.Def_DelayedSWPT_Extended_Problem
Formal statement
namespace DelayedSWPT.Extended
open DelayedSWPT.Model
/-- Anderson and Potts (2004), §3.2, p. 690: the schedule `π_E` is feasible for the extended
problem (E). -/
theorem piE_feasible {n : ℕ} (I : Instance n) : IsFeasible (rE I) (pE I) (piE I) := by sorry
end DelayedSWPT.Extended
Source
Anderson and Potts, Online Scheduling of a Single Machine to Minimize Total Weighted Completion Time, Math. Oper. Res. 29(3) (2004), p. 690, §3.2
Human review
Confirmed by the mission captain (proposal self-audit).
Confirmed by the moderator at approval.