THEOREM 1(b): if (6) holds then i_1 = l(j), an optimal last setup period for the horizon j
ProvedFedergruenTzur.MinPred.theorem1b_first_optimalIn the dynamic lot size model with costs given by the recursion (2), fix and let with be ranked in nonascending order of -values, ties in ascending order of period index, with critical values and . If condition (6), , holds, then the first element is an optimal last setup period for the horizon :
This is the paper's "", where denotes an optimal period for the last setup when minimizing the cost of the first periods (§2, p. 914). It means the forward algorithm reads off and from the head of its list in constant time.
Formalization Note. The conclusion is stated as: the list has a first entry and , so it is not vacuous on an empty list. is taken in the open-interval reading; is defined by (2).
import Mathlib import Definitions.Def_FedergruenTzur_MinPred_Omega import Definitions.Def_FedergruenTzur_MinPred_RankedList
namespace FedergruenTzur.MinPred
open LotSizing
/-- THEOREM 1(b), p. 915: if a ranked list `L = [i_1, …, i_r]` of periods in `{1, …, j}` contains
`Ω(j)` and satisfies (6), then its first entry `i_1` is an optimal last setup period for the horizon
`j`, i.e. `F(i_1, j) = F(j)` (the paper's `i_1 = l(j)`). -/
theorem theorem1b_first_optimal (P : LotSizing) (j : ℕ) (hj : 1 ≤ j) (L : List ℕ)
(hL : P.IsRanked j L) (hΩ : P.Omega j ⊆ L.toFinset) (h6 : P.Cond6 j L) :
∃ i₁, L.head? = some i₁ ∧ P.Flast i₁ j = P.Fopt j := by sorry
end FedergruenTzur.MinPred
Confirmed by the mission captain (proposal self-audit).
Confirmed by the moderator at approval.