Proposition 1 (FP, TF+), p. 11, restated p. 12 — Φ^FP = Φ^TF+ = {1}, negotiated terms p = Q (and β = 0), and no coordinating solution for θ < 1
ProvedProjectOutsourcing.SingleTask.prop1_fp_tfplusnash-bargainingp2o-batch-pfp2ap2o-gran-per-chapterp2o-plan-paperp2o-v1project-contractingsystem-coordination
Under the standing assumptions of Section 3,
- : the fixed-price contract and the two-part fixed-price contract with nonnegative down payment coordinate the system exactly when the subcontractor has full bargaining power ;
- at every solution of Problem B (3) under FP has , and every solution under TF+ has , ;
- for every , no solution of Problem B under FP or under TF+ induces a system-optimal work rate.
Item 3 is the strong form of "fails to coordinate": it is not only that some solution misses , but that every solution does.
Formalization Note The fixed-price contract's second coordinate is a dummy fixed at . "Coordinates" means that a solution exists and every solution induces the system-optimal rate.
Preamble
import Mathlib import Definitions.Def_ProjectOutsourcing_SingleTask_Setting
Formal statement
namespace ProjectOutsourcing.SingleTask
theorem prop1_fp_tfplus (M : Model) (hM : M.Valid) :
Phi M .FP = {1} ∧ Phi M .TFplus = {1} ∧
(∀ x, IsNashSol M .FP 1 x → x.1.1 = M.Q) ∧
(∀ x, IsNashSol M .TFplus 1 x → x.1 = (M.Q, 0)) ∧
(∀ θ ∈ Set.Ico (0 : ℝ) 1, ∀ x, IsNashSol M .FP θ x → ¬ IsSystemOpt M x.2) ∧
(∀ θ ∈ Set.Ico (0 : ℝ) 1, ∀ x, IsNashSol M .TFplus θ x → ¬ IsSystemOpt M x.2) := by sorry
end ProjectOutsourcing.SingleTask
Source
Hou, Lu, Deng, Shen, Coordinating Project Outsourcing through Bilateral Contract Negotiations, author manuscript (SSRN 3443865; MSOM, doi:10.1287/msom.2020.0911), p. 11, Proposition 1 (parts FP, TF+); restatement p. 12
Human review
Confirmed by the mission captain (proposal self-audit).
Confirmed by the moderator at approval.