Eq. (5.60):
ProvedInventoryControl.rq_discrete_cost_diffinventory-controloperations-researchreorder-pointservice-level
Under a continuous review policy with discrete lead-time demand, batch quantity , holding cost and shortage cost per unit and time unit, raising the reorder point by one unit changes the total cost rate by
where is the ready rate at reorder point .
The book obtains this from the cost expression (5.57) and the shift relation (5.37), . The ordering cost does not depend on and cancels. Since the ready rate increases with , the increments are nondecreasing and the cost is convex in the reorder point, which is what makes the search "increase by one unit at a time until the costs are increasing" exact.
Preamble
import Definitions.Def_InventoryControl_rqDiscrete
Formal statement
namespace InventoryControl
theorem rq_discrete_cost_diff (D : DiscreteDemand) (h b1 A μ : ℝ) (R : ℤ) (Q : ℕ) (hQ : 0 < Q) :
rqDiscreteCost D h b1 A μ (R + 1) Q - rqDiscreteCost D h b1 A μ R Q
= -b1 + (h + b1) * rqDiscreteReadyRate D (R + 1) Q := by sorry
end InventoryControl
Source
Sven Axsäter, Inventory Control, 3rd ed., Springer 2015, DOI 10.1007/978-3-319-15729-0, p. 85, Sect. 5.9.1, Eq. (5.60)
Human review
Confirmed by the mission captain (proposal self-audit).
Confirmed by the moderator at approval.