Proposition 1, p. 7 (PDF 8) — allocation (3)–(4) with the transfers of p. 15 is IC, IR and maximizes the buyer surplus over complete contracts
ProvedIncompleteProc.English.proposition_1Consider the direct mechanism of Proposition 1, with transfers from the proof:
- supplier supplies in period 1 iff and (3);
- he supplies in period 2 in state iff, in addition, (4).
This mechanism is admissible, incentive compatible and individually rational. Its buyer surplus is the greatest buyer surplus among all admissible, incentive-compatible and individually rational direct mechanisms:
This is the complete-contract benchmark: the largest surplus the buyer can secure when she commits to a two-period contract in period 1. Proposition 3 shows that an English auction followed by a spot offer attains the same value without such commitment.
Formalization Note "The allocation that maximizes the buyer surplus" is stated as optimality of the mechanism over the whole class, with the attaining mechanism exhibited (a maximum, not a supremum). Ties go to the lowest index, which the page allows (footnote 9). Under the unconditional reading of , (4) carries the extra conjunct : without it the mechanism would buy in period 2 from a supplier it did not buy from in period 1. The thresholds are crossing points and , as explained in the model definition.
import Mathlib import Definitions.Def_IncompleteProc_English_Model
namespace IncompleteProc.English
open MeasureTheory
/-- Proposition 1 (p. 7) with the transfer rule of its proof (p. 15): the direct mechanism with
allocation (3)–(4) and transfers `tⁱ(C) = T(cⁱ)` is admissible, incentive compatible and
individually rational, and its buyer surplus is the greatest buyer surplus among all admissible,
incentive-compatible, individually rational direct mechanisms. -/
theorem proposition_1 {Ω : Type*} [MeasurableSpace Ω] (E : Env Ω) (hS : E.Standing)
(hA : E.Assumption1) :
E.optMech.Admissible E ∧ E.optMech.IsIC E ∧ E.optMech.IsIR E ∧
IsGreatest E.feasibleSurplus (E.optMech.buyerSurplus E) := by sorry
end IncompleteProc.English
Confirmed by the mission captain (proposal self-audit).
Confirmed by the moderator at approval.