Formula (9) — c_jk = max_{1≤i≤m} {q_ji − q_{k,i−1}} is the least gap between B_j and B_k
ProvedSchedComplexity.NoWait.formula_9_delayConsider a no-wait flow shop with jobs, machines and processing times , and let as in (8). For two distinct jobs and , the paper defines as "the minimum length of the time interval between and if is scheduled directly after ", and states (9):
Precisely: among all such that, with , the operation of on every machine ends no later than the operation of on starts, i.e.
the least is .
This is the weight of the arc in the travelling-salesman reformulation of no-wait scheduling.
Formalization Note " is scheduled directly after " is read as " precedes on every machine", the only constraint between the two jobs; no other job intervenes in this statement. The gap ranges over the nonnegative integers (as elements of ).
import Mathlib import Definitions.Def_SchedComplexity_NoWait_NoWaitFlowShop
namespace SchedComplexity.NoWait
/-- Formula (9), p. 24: if job `k` is scheduled directly after job `j` (read: `B_k = B_j + δ`
with `δ ≥ 0`, and on every machine the operation of `j` ends before the operation of `k`
starts), the least admissible `δ` is `c_{jk} = max_{1 ≤ i ≤ m} {q_{j i} − q_{k,i−1}}`. -/
theorem formula_9_delay {n m : ℕ} (p : Fin n → Fin m → ℕ) (hm : 0 < m) (j k : Fin n)
(hjk : j ≠ k) :
IsLeast {δ : ℤ | 0 ≤ δ ∧ ∀ r : Fin m, (cum p j (r.val + 1) : ℤ) ≤ δ + (cum p k r.val : ℤ)}
(delay p hm j k) := by sorry
end SchedComplexity.NoWait