Corollary 2.1*, p. 713 — if d_j = max_i d_i and d_j + p_j ≥ p, then J_j is last in an optimal schedule
ProvedEmmonsTardiness.EDD.corollary_2_1_starConsider a finite set of jobs on one machine, job with processing time and due date , and write for the total processing time. Let be convex and nondecreasing on ; a schedule is optimal if it minimizes , .
Corollary 2.1*. If has the latest due date, , and
then is last: there is an optimal schedule whose last job is .
The corollary removes one job from the end of the sequence; repeated together with the last-job reduction it proves Corollary 2.2*.
Formalization Note " is last" is stated as the existence of an optimal schedule (optimal against every schedule of ) ending in . Ties for the maximum due date are allowed, as on the page ( is a maximum, not the unique one). The statement does not use the job indices. Processing times are assumed nonnegative (durations); the reduction of p. 703 is not assumed.
import Mathlib import Definitions.Def_EmmonsTardiness_EDD_Model
namespace EmmonsTardiness.EDD
/-- Emmons 1969, p. 713, Corollary 2.1*: if `d_j = max_i {d_i}` and `d_j + p_j ≥ p = Σ_J p_i`,
then `J_j` is last in some schedule minimizing `Σ_J g(T_i)`. -/
theorem corollary_2_1_star {ι : Type*} [DecidableEq ι] (g : ℝ → ℝ) (p d : ι → ℝ)
(J : Finset ι)
(hg : ConvexOn ℝ (Set.Ici 0) g) (hgm : MonotoneOn g (Set.Ici 0))
(hp : ∀ i ∈ J, 0 ≤ p i)
(j : ι) (hj : j ∈ J) (hmax : ∀ i ∈ J, d i ≤ d j)
(hlast : ∑ i ∈ J, p i ≤ d j + p j) :
∃ l : List ι, IsOptimal g p d J l ∧ l.getLast? = some j := by sorry
end EmmonsTardiness.EDD
Confirmed by the mission captain (proposal self-audit).
Confirmed by the moderator at approval.