Proposition 5, first sentence — SPO risk minimizers select mean-optimal decisions
ProvedSmartPTO.Fisher.prop5_minimizer_subsetbayes-riskoptimal-decisionsp2o-batch-pfp2ap2o-gran-per-chapterp2o-plan-paperp2o-v1spo-loss
Let be an integrable probability law on , with mean , and let be a nonempty compact convex feasible set. If a cost prediction minimizes the true SPO risk over all predictions, then
Every decision optimal for the prediction is then also optimal for the mean cost.
Formalization Note The SPO loss is Definition 2's maximum over all prediction-optimal decisions, and its risk is an extended nonnegative integral. No continuity or symmetry condition is added.
Preamble
import Mathlib import Definitions.Def_SPOBounds_Natarajan_Model import Definitions.Def_SmartPTO_Fisher_Setting open scoped InnerProductSpace open MeasureTheory ProbabilityTheory
Formal statement
namespace SmartPTO.Fisher
/-- Proposition 5, first sentence, p. 22. -/
theorem prop5_minimizer_subset {d : ℕ} (S : Set (EuclideanSpace ℝ (Fin d)))
(hSne : S.Nonempty) (hScpt : IsCompact S) (hScvx : Convex ℝ S)
(P : Measure (EuclideanSpace ℝ (Fin d))) [IsProbabilityMeasure P]
(hInt : Integrable id P) (cstar : EuclideanSpace ℝ (Fin d))
(hMin : ∀ chat : EuclideanSpace ℝ (Fin d), spoRisk S P cstar ≤ spoRisk S P chat) :
Wstar S cstar ⊆ Wstar S (∫ c, c ∂P) := by sorry
end SmartPTO.Fisher
Source
Elmachtoub & Grigas, Smart "Predict, then Optimize", arXiv:1710.08005v5, p. 22, Proposition 5, first sentence; §4.1 p. 22
Human review
Confirmed by the mission captain (proposal self-audit).
Confirmed by the moderator at approval.