A coordinated effort to formalize the mathematics of operations research in Lean 4.
Scope: missions in linear and integer programming, convex and nonlinear optimization, combinatorial optimization, dynamic programming, scheduling, stochastic models such as queueing and inventory, simulation, revenue management, and game theory and mechanism design.
The Tight Constant in the Dvoretzky–Kiefer–Wolfowitz Inequality II: Binomial Tail Bound P(S − np > nε) ≤ exp(−nε²/(2(p + ε/3)(q − ε/3))) for 0 < ε ≤ qResearch Paper
Exponential bounds for the tails of the binomial distribution are among the most frequently used tools in probability, statistics and the analysis of algorithms: they control the number of successes in independent trials, the deviation of an empirical frequency from its mean, and, through counting arguments, the empirical distribution function itself. The…
Application of the Branch and Bound Technique to Some Flow-Shop Scheduling Problems 1: Branch and Bound with the Three-Machine Lower Bound Finds a Minimum-Makespan SequenceResearch Paper
In a flow shop every job passes through the same machines in the same order. Choosing the order in which jobs enter the shop so that the last job finishes as early as possible (minimizing the makespan) is one of the oldest problems of scheduling theory. For two machines Johnson (1954) gave an exact sorting rule; for three machines his rule is exact only in…
The Theory of Queues with a Single Server: The Waiting-Time Distribution Has a Proper Limit iff E(u) < 0 or u = 0 Almost SurelyResearch Paper
The single-server queue with general independent interarrival and service times (the GI/G/1 queue) is the basic model of congestion in operations research: customers arrive at a service facility, wait if the server is busy, are served in order of arrival, and leave. The first question about any such system is whether it settles down. If customers keep…
Dynamic Instabilities and Stabilization Methods in Distributed Real-Time Scheduling of Manufacturing Systems 1: Clearing Policies Are Unstable on a Re-Entrant Two-Machine Line, Even Without Set-UpsResearch Paper
A flexible manufacturing system is a set of machines through which parts of several types travel along fixed routes; each machine serves several buffers and must pay a set-up time whenever it switches from one buffer to another. Real-time scheduling decides, as the system evolves, which buffer each machine works on. Perkins and Kumar (IEEE Trans. Automat.…
Flowshop and Jobshop Schedules: Complexity and Approximation 6: Concatenating Optimal Schedules of Processor Pairs Gives Finish Time within ⌈m/2⌉ Times the OptimumResearch Paper
A flow shop is the simplest model of a production line: every job passes through the same sequence of machines in the same order. Minimizing the time at which the last job leaves the last machine (the finish time, or makespan) is easy for two machines, where Johnson's rule gives an optimal schedule in time O(nlogn) (Johnson 1954), and NP-hard from three…
Subadditive Ergodic Theory 2: For Every Increasing Γ There Is a C^∞ Process with Stationary Increments and P{|y_t| ≤ Γ(t) for All Large t} = 0Research Paper
Kingman's subadditive ergodic theorem (Theorem 1 of Kingman 1973, first proved in Kingman 1968) says that for a discrete-parameter subadditive process x=(xst) the ratio x0t/t converges with probability one and in mean. Applications in first-passage percolation, products of random matrices and longest increasing subsequences often come with a…
Flowshop and Jobshop Schedules: Complexity and Approximation 5: Sequencing Jobs by Shortest Total Processing Time Gives Mean Flow Time within m Times the OptimumResearch Paper
Flow shops and job shops are the basic models of multi-stage production: every job passes through several machines, and each machine handles one task at a time. Gonzalez and Sahni (Operations Research 26(1), 1978) showed that minimizing the finish time of such shops is NP-complete even with preemption, and then asked how well simple heuristics do. One of…
Flowshop and Jobshop Schedules: Complexity and Approximation 4: The 3-Partition Job Shop on Two Machines Has a Schedule of Finish Time 2tB, Preemptive or Not, Iff a 3-Partition ExistsResearch Paper
In a job shop, each job has an ordered list of tasks, and each task must use a specified machine. A production planner may be able to interrupt a task and resume it later, yet still be unable to find a short schedule efficiently. Gonzalez and Sahni studied how the ability to preempt changes the difficulty of minimizing the time at which all jobs are…
Flowshop and Jobshop Schedules: Complexity and Approximation 1: The Partition Flow Shop on Three Machines Has a Schedule of Finish Time 2T, Preemptive or Not, Iff a Partition ExistsResearch Paper
Shop scheduling asks how to process a set of jobs, each a sequence of tasks on prescribed machines, so that all work is completed as early as possible. The flow shop, in which every job visits the machines in the same order, is the most studied of these models in operations research. For two machines, Johnson's rule (1954) computes a schedule of minimum…
Linear Programming and Finite Markovian Control Problems IV: Positive Dynamic Programming — an Extreme Optimal Dual Solution Yields a Pure Stationary Optimal PolicyTextbook
A finite Markov decision system asks how to choose actions while a changing state controls which actions are available. The choice can affect both the reward now and the distribution of future states. In a total-reward problem, the process can continue indefinitely; if transitions are substochastic, it can also terminate. Kallenberg's treatment of positive…
Some Polyhedra Related to Combinatorial Problems III: Faces of P(H, ψg0) Lift Through a Homomorphism ψ of G onto H to Faces of P(G, g0)Research Paper
Every pure integer program, once its linear programming relaxation has been solved, can be relaxed further to a problem over a finite Abelian group: the nonbasic variables must satisfy a single congruence in the group of the optimal basis. R. E. Gomory introduced this relaxation in 1965 and studied the convex hull of its solutions in Some polyhedra related…
Some Polyhedra Related to Combinatorial Problems II: The Faces of the Master Polyhedron P(G, g0) Are the Basic Feasible Solutions of a Subadditive Linear SystemResearch Paper
Finite group equations arise when an integer program is expressed relative to an integer basis: the residue of a candidate solution in a finite Abelian group records whether it satisfies the original integrality requirement. Gomory's group polyhedron collects the nonnegative integer solutions with one prescribed residue. Its faces give valid linear…
Linear Programming and Finite Markovian Control Problems IX: Discounted Semi-Markov Decision Processes — the Value Vector Is the Smallest Superharmonic VectorTextbook
A decision maker may choose an action whenever a system changes state, even though the time until the next change is random. Maintenance and replacement decisions are examples: a repair choice changes both the next operating state and the length of time before another choice is available. A discrete-time Markov decision model gives every decision epoch the…
Some Polyhedra Related to Combinatorial Problems I: A Minimizing Vertex of the Corner Polyhedron Gives an Optimal Integer Solution When the Right-Hand Side Lies Deep in the Basis ConeResearch Paper
An integer program in standard form, maxc⋅x subject to Ax=b, x≥0, x integer, is easy to state and hard to solve. Its linear programming relaxation is solved by the simplex method, which ends at an optimal basisB. The difference between the two problems is the integrality of x, and R. E. Gomory's 1969 paper Some polyhedra related to combinatorial…
Linear Programming and Finite Markovian Control Problems VIII: Single-Controller Stochastic Games — a Dual Pair of Linear Programs Gives the Value and Stationary Optimal PoliciesTextbook
A two-person zero-sum stochastic game (also called a Markov game) is a Markov decision problem with two decision makers who pull in opposite directions: at every time point both players choose an action simultaneously, one player pays the other, and the system moves to a random next state whose law depends on the current state and both actions. Stochastic…
Linear Programming and Finite Markovian Control Problems II: An Extreme Optimal Solution of the Dual Linear Program Yields a Pure Stationary Policy Optimal among Transient PoliciesTextbook
A Markov decision model describes a system that repeatedly occupies a state, receives a reward when an action is chosen, and then moves according to action-dependent probabilities. Termination may occur after any action. In a model with signed rewards, a policy that continues indefinitely can have a different total-reward behavior from one that eventually…
Outline of an Algorithm for Integer Solutions to Linear Programs: The Fractional Cut (3) Cuts Off the Simplex Solution but Keeps Every Nonnegative Integer Solution and the Integer Maximum of wResearch Paper
Integer linear programming asks for the best point whose coordinates are integers, even though linear programming methods naturally search over real points. In his 1958 note, Gomory describes a systematic way to add a constraint that excludes a fractional simplex solution while retaining every nonnegative integer solution. This mission isolates that single…
Linear Programming and Finite Markovian Control Problems I: Five Equivalent Characterizations of a Transient Markov Decision Problem, among Them Contraction and a Finite Linear ProgramTextbook
Finite Markov decision models are often described by policies that choose an action from the current state. The admissible class in a total reward problem is wider: a randomized decision may use the complete history of observed states and chosen actions. For an undiscounted infinite horizon, the expected number of visits to a state may be infinite, and the…
Linear Programming and Finite Markovian Control Problems III: Contracting Dynamic Programming — Pure, Stationary, Markov and General Policies Span One State-Action Frequency PolytopeTextbook
Finite Markov decision models describe repeated choices whose consequences depend on the present state. They are used when a planner needs one rule that works from every starting state, yet the rule may in principle respond to the entire observed history. Linear programming offers a different description: it records how often each state and action are used,…
On Approximate Solutions of Systems of Linear Inequalities: If Ax ≦ b Is Consistent, Every x Has a Solution x₀ with Fₙ(x − x₀) ≦ c·Fₘ((Ax − b)⁺)Research Paper
Iterative methods for a system of linear inequalities Ax≤b stop at a vector xˉ that only almost satisfies the system: the violation (Axˉ−b)+ is small but not zero. A user then needs to know that xˉ is close to an actual solution. Hoffman's 1952 paper (J. Res. Nat. Bur. Standards 49) gives the first quantitative form of this fact: the…
Approximation Schemes for the Restricted Shortest Path Problem: The Rounding Algorithm Outputs a T-Path of Length at Most (1 + ε)·OPTResearch Paper
The restricted shortest path problem asks for a shortest route between two points of a network subject to a budget on a second additive quantity, such as travel time, cost or risk. It appears as the pricing subproblem of column generation for crew scheduling and vehicle routing, in quality-of-service routing in communication networks, and in scheduling,…
Nonlinear Proximal Point Algorithms Using Bregman Functions, with Applications to Convex Programming 1: The Bregman Proximal Point Algorithm Converges to a Zero of a Maximal Monotone OperatorResearch Paper
The proximal point algorithm is a way to find a zero of a set-valued monotone operator by repeatedly solving a regularized version of that operator equation. Its classical regularizer is quadratic, so the distance from one iterate to the next is Euclidean. In convex optimization, that geometry can be poorly matched to the domain: the natural iterates may be…
How Many Parts to Make at Once: The Cost per Unit (CX + S)/240M + S/X + C Is Minimized Exactly at the Lot Size X = √(240MS/C)Research Paper
Every manufacturer who makes a part in batches faces the trade-off Ford W. Harris described in 1913: large lots spread the fixed set-up cost of an order over many pieces, but they also tie up money in stock that must be carried. Harris's article "How many parts to make at once" (Factory, The Magazine of Management 10(2), 1913, reprinted in Operations…
Bounds on Multiprocessing Timing Anomalies 1: Changing the List, Relaxing the Order, Shortening the Tasks and Using n′ Processors Multiplies the Finishing Time by at Most 1 + (n − 1)/n′Research Paper
Scheduling work on several identical processors creates a plausible expectation: completing tasks sooner, removing constraints, or adding a processor should not delay the overall finish. A fixed priority-list rule defeats that expectation. When a task becomes ready earlier, it can occupy a processor that would otherwise have run another task; that decision…
Bounds on Multiprocessing Timing Anomalies 2: Scheduling the k Longest Independent Tasks Optimally First Gives ω(k)/ω₀ ≤ 1 + (1 − 1/n)/(1 + ⌊k/n⌋)Research Paper
Parallel processing poses a basic allocation question: given tasks of known lengths and several identical processors, how much time is lost when tasks are assigned by a simple list rule instead of an optimal allocation? The finishing time is the moment the last processor completes its work. For independent tasks, a list rule starts each next task on a…