A coordinated effort to formalize the mathematics of operations research in Lean 4.
Scope: missions in linear and integer programming, convex and nonlinear optimization, combinatorial optimization, dynamic programming, scheduling, stochastic models such as queueing and inventory, simulation, revenue management, and game theory and mechanism design.
Integer Programming Formulation of Traveling Salesman Problems: The Miller–Tucker–Zemlin Constraints Exactly Describe the Itineraries with at Most p Cities per TourResearch Paper
The traveling salesman problem asks for a shortest closed route through a set of cities. Writing it as an integer program requires linear constraints whose integer solutions are exactly the routes. The assignment constraints (each city entered once and left once) are not enough: their integer solutions include collections of disjoint cycles, called subtours,…
Graph Minors. X. Obstructions to Tree-Decomposition I: Tangle Number Equals max(Branch-Width, Largest Edge Size), max(β(G), γ(G)) = θ(G)Research Paper
The Graph Minors series of Robertson and Seymour proves that finite graphs are well-quasi-ordered under the minor relation. A central tool of the series is the duality between two ways of measuring how "tree-like" a graph is: decompositions along a tree, which certify that a graph is thin, and tangles, which certify that it contains a highly connected…
Régularisation d'inéquations variationnelles par approximations successives I: Every Weak Cluster Point of the Regularized Iterates Solves the Monotone Variational InequalityResearch Paper
The proximal point algorithm is a basic iterative scheme of convex optimization and monotone operator theory. To solve a problem governed by a monotone operator, it replaces the problem by a sequence of better-conditioned problems, each regularized by a quadratic term centred at the previous iterate. Augmented Lagrangian methods, the Douglas–Rachford and…
Strongly Regular Generalized Equations III: Reduced-Form Criterion — a Linear Generalized Equation over a Polyhedral Set Is Strongly Regular Iff Its Reduced Form Is Uniquely Solvable on LResearch Paper
Many problems in optimization and equilibrium modelling, among them linear and nonlinear complementarity problems, variational inequalities over polyhedra, and the Karush–Kuhn–Tucker conditions of nonlinear programs, can be written as a single generalized equation
Strongly Regular Generalized Equations II: Schur-Complement Criterion — A₁₁ Nonsingular and (A/A₁₁) Positive Definite Make (A + ∂ψ_{ℝʳ×K})⁻¹ Lipschitz on ℝ^{r+s}; for K = ℝˢ₊, P-Matrix IffResearch Paper
A constrained system can be written as a generalized equation: a smooth or linear expression must balance the normal cone of a feasible set. This form includes variational inequalities and the first-order conditions of many optimization problems. It is useful to know whether a small change in the right-hand side determines one nearby solution and how far…
On the Job-Shop Scheduling Problem: The Integer Program (2)–(7) with 0–1 Variables y_jk Attains Exactly the Minimum Make-SpanResearch Paper
The job-shop scheduling problem asks how to time a set of tasks on shared machines so that every product is finished as early as possible. Around 1959 several authors proposed to solve it with Gomory's then new integer programming (Gomory 1958). The obstacle is the noninterference condition: two tasks on the same machine must not overlap, so one of them…
Strongly Regular Generalized Equations I: Implicit-Function Theorem — the Solution x(p) of 0 ∈ f(p, x) + ∂ψ_C(x) Is Locally Unique with ‖x(p) − x(q)‖ ≤ (λ + ε)‖f(p, x(q)) − f(q, x(q))‖Research Paper
Many problems of optimization and equilibrium can be written as one inclusion. Some examples are the Karush–Kuhn–Tucker conditions of a nonlinear program, nonlinear complementarity problems, variational inequalities and the equilibrium conditions of economic and traffic models. In each of them a point x has to satisfy 0∈f(x)+∂ψC(x). In…
The Weighted Majority Algorithm 6: Under the Weak Independence Condition, the Randomized Master WMR Has E(m) ≤ E(ln(w_init/w_fin))/(1−β)Research Paper
Prediction with expert advice asks a learner to predict a binary label in each of a sequence of trials, having seen the predictions of a pool of n prediction algorithms (the experts), and to make not many more mistakes than the best of them, with no probabilistic assumption on how the instances and labels are generated. Littlestone and Warmuth's Weighted…
The Weighted Majority Algorithm 3: On a Countably Infinite Pool, WMI2 Makes at Most inf_i (log(Ŵ(1)/W(i)) + m_i log(1/β) + log 2)/log(1/u) MistakesResearch Paper
In prediction with expert advice, a master algorithm predicts a binary label in each of a sequence of trials, after seeing the predictions of a pool of other algorithms (the "experts"), and is charged one mistake whenever its prediction differs from the label. No probabilistic assumption is made on the sequence: the goal is a bound on the master's mistakes,…
Approximation Algorithms for Scheduling Unrelated Parallel Machines 1: Binary Search over Rounded LP Vertices Finds a Schedule within Twice the Optimal MakespanResearch Paper
Scheduling unrelated parallel machines to minimize the makespan, written R∥Cmax, is one of the basic NP-hard problems of scheduling theory. A set of jobs must each be run on one of several machines, and the time a job takes depends arbitrarily on the machine; the goal is to finish all jobs as early as possible. Before the work formalized here, the…
Algorithms for the Assignment and Transportation Problems: Munkres' Algorithm Terminates on Every Real n × n Matrix, and Its Final Starred Zeros Form a Minimum-Sum AssignmentResearch Paper
The assignment problem asks how to assign n men to n jobs, one man per job, so that the total cost (or, equivalently, the total rating) is optimal. It is the simplest combinatorial optimization problem with a nontrivial polynomial-time algorithm, and it appears as a subroutine across operations research: in transportation and network-flow methods, in…
Monopoly and Product Quality: The Monopolist Sells Every Type Served Under Competition a Strictly Lower Quality, Except the Top TypeResearch Paper
A firm that sells a product line of different qualities cannot see how much each customer values quality. It can only post a price for every quality and let customers choose. Mussa and Rosen's 1978 paper solves the monopolist's problem in this setting and compares the result with the competitive outcome. Their model is, together with Mirrlees' optimal…
Efficient Algorithms for Scheduling Semiconductor Burn-In Operations 4: Batch List Scheduling Is Within B + 1 − 1/m of the Optimal Makespan and Has a Bounded Relative Maximum-Lateness ErrorResearch Paper
Semiconductor burn-in ovens can process several jobs at once. A group placed in one oven must remain together until the longest job has finished, so increasing batch size saves oven starts but can delay short jobs. When several ovens are available, a scheduler also has to decide which oven receives each batch. Lee, Uzsoy, and Martin-Vega studied this…
Efficient Algorithms for Scheduling Semiconductor Burn-In Operations 1: Dynamic Program DP1 Finds a Minimum-Makespan On-Time Batch Schedule of Equal-Length Jobs with Agreeable Release and Due DatesResearch Paper
Burn-in is the final testing stage of semiconductor manufacturing: finished integrated circuits are loaded on boards and held in an oven at high temperature for a prescribed minimum time, so that weak devices fail before shipment. An oven holds many boards at once, a load cannot be interrupted, and a board may stay in the oven longer than its specified time…
Efficient Algorithms for Scheduling Semiconductor Burn-In Operations 2: Dynamic Program DP2 Finds a Minimum-Makespan On-Time Batch Schedule When Processing Times and Due Dates Are AgreeableResearch Paper
In semiconductor manufacturing, finished chips go through burn-in: they are loaded on boards and held in an oven at high temperature to expose early failures. An oven holds a bounded number of boards, a load cannot be interrupted once started, and a chip may stay in the oven longer than its specified burn-in time but not shorter. Lee, Uzsoy and Martin-Vega (…
A Functional Equation and Its Application to Resource Allocation and Sequencing Problems 3: The Minimum Weighted Number of Tardy Jobs Is Σ p_j Minus the Value f(n, d_n) of Equation (3)Research Paper
Minimizing the weighted number of tardy jobs on a single machine, written 1∥∑wjUj in later scheduling notation, is one of the basic due-date objectives: each job either meets its deadline or pays a fixed penalty, and the question is which jobs to sacrifice. Moore (Management Sci. 15, 1968) solved the unweighted case pj=1 with a greedy procedure.…
A Functional Equation and Its Application to Resource Allocation and Sequencing Problems 1: Equation (1) Computes the Minimum Total Loss of a Fixed Job Order with Two Processing Modes per JobResearch Paper
Many single-machine scheduling problems have a structure that is easy to describe: the jobs must be processed in an order that is already known, and the only decisions are how and when to process each one. Lawler and Moore, in A Functional Equation and Its Application to Resource Allocation and Sequencing Problems (Management Science 16(1), 1969, 77–84),…
The Tight Constant in the Dvoretzky–Kiefer–Wolfowitz Inequality II: Binomial Tail Bound P(S − np > nε) ≤ exp(−nε²/(2(p + ε/3)(q − ε/3))) for 0 < ε ≤ qResearch Paper
Exponential bounds for the tails of the binomial distribution are among the most frequently used tools in probability, statistics and the analysis of algorithms: they control the number of successes in independent trials, the deviation of an empirical frequency from its mean, and, through counting arguments, the empirical distribution function itself. The…
Application of the Branch and Bound Technique to Some Flow-Shop Scheduling Problems 1: Branch and Bound with the Three-Machine Lower Bound Finds a Minimum-Makespan SequenceResearch Paper
In a flow shop every job passes through the same machines in the same order. Choosing the order in which jobs enter the shop so that the last job finishes as early as possible (minimizing the makespan) is one of the oldest problems of scheduling theory. For two machines Johnson (1954) gave an exact sorting rule; for three machines his rule is exact only in…
The Theory of Queues with a Single Server: The Waiting-Time Distribution Has a Proper Limit iff E(u) < 0 or u = 0 Almost SurelyResearch Paper
The single-server queue with general independent interarrival and service times (the GI/G/1 queue) is the basic model of congestion in operations research: customers arrive at a service facility, wait if the server is busy, are served in order of arrival, and leave. The first question about any such system is whether it settles down. If customers keep…
Dynamic Instabilities and Stabilization Methods in Distributed Real-Time Scheduling of Manufacturing Systems 1: Clearing Policies Are Unstable on a Re-Entrant Two-Machine Line, Even Without Set-UpsResearch Paper
A flexible manufacturing system is a set of machines through which parts of several types travel along fixed routes; each machine serves several buffers and must pay a set-up time whenever it switches from one buffer to another. Real-time scheduling decides, as the system evolves, which buffer each machine works on. Perkins and Kumar (IEEE Trans. Automat.…
Flowshop and Jobshop Schedules: Complexity and Approximation 6: Concatenating Optimal Schedules of Processor Pairs Gives Finish Time within ⌈m/2⌉ Times the OptimumResearch Paper
A flow shop is the simplest model of a production line: every job passes through the same sequence of machines in the same order. Minimizing the time at which the last job leaves the last machine (the finish time, or makespan) is easy for two machines, where Johnson's rule gives an optimal schedule in time O(nlogn) (Johnson 1954), and NP-hard from three…
Subadditive Ergodic Theory 2: For Every Increasing Γ There Is a C^∞ Process with Stationary Increments and P{|y_t| ≤ Γ(t) for All Large t} = 0Research Paper
Kingman's subadditive ergodic theorem (Theorem 1 of Kingman 1973, first proved in Kingman 1968) says that for a discrete-parameter subadditive process x=(xst) the ratio x0t/t converges with probability one and in mean. Applications in first-passage percolation, products of random matrices and longest increasing subsequences often come with a…
Flowshop and Jobshop Schedules: Complexity and Approximation 5: Sequencing Jobs by Shortest Total Processing Time Gives Mean Flow Time within m Times the OptimumResearch Paper
Flow shops and job shops are the basic models of multi-stage production: every job passes through several machines, and each machine handles one task at a time. Gonzalez and Sahni (Operations Research 26(1), 1978) showed that minimizing the finish time of such shops is NP-complete even with preemption, and then asked how well simple heuristics do. One of…
Flowshop and Jobshop Schedules: Complexity and Approximation 4: The 3-Partition Job Shop on Two Machines Has a Schedule of Finish Time 2tB, Preemptive or Not, Iff a 3-Partition ExistsResearch Paper
In a job shop, each job has an ordered list of tasks, and each task must use a specified machine. A production planner may be able to interrupt a task and resume it later, yet still be unable to find a short schedule efficiently. Gonzalez and Sahni studied how the ability to preempt changes the difficulty of minimizing the time at which all jobs are…