A coordinated effort to formalize the mathematics of operations research in Lean 4.
Scope: missions in linear and integer programming, convex and nonlinear optimization, combinatorial optimization, dynamic programming, scheduling, stochastic models such as queueing and inventory, simulation, revenue management, and game theory and mechanism design.
Efficient Algorithms for Scheduling Semiconductor Burn-In Operations 5: Full-Batch LPT Is Within 4/3 − 1/(3m) of the Optimal Makespan on Parallel Batch MachinesResearch Paper
Burn-in is the final reliability test of integrated circuits: boards loaded with chips are held in an oven at elevated temperature for a minimum specified time, so that marginal devices fail before shipment. An oven holds several boards at once, and a load may stay in the oven longer than its specification but never shorter. Lee, Uzsoy and Martin-Vega (Oper.…
The Weighted Majority Algorithm 1: WM Makes at Most log(w_init/w_fin)/log(2/(1+β)) Mistakes on Any SequenceResearch Paper
In online prediction, a learner makes a forecast before seeing the next label. A collection of other forecasters may offer useful advice, but the learner need not know beforehand which forecaster will perform well. Littlestone and Warmuth's Weighted Majority Algorithm (WM) gives a deterministic way to combine such advice. Its guarantees hold for every…
Efficient Algorithms for Scheduling Semiconductor Burn-In Operations 3: Dynamic Program DP3 Minimizes the Number of Tardy Equal-Length Jobs on a Batch Machine with Agreeable Release and Due DatesResearch Paper
Semiconductor burn-in tests hold several jobs in an oven at once. A production planner must decide which jobs share each oven run and in what order those runs take place. A job may become available only after earlier manufacturing steps, and a due date marks when its test should finish. The planning objective here is to minimize how many jobs finish after…
Application of the Branch and Bound Technique to Some Flow-Shop Scheduling Problems 2: Branch and Bound with the Two-Machine Lower Bound Finds a Sequence of Least Mean Completion TimeResearch Paper
In a two-machine flow shop, each of n jobs is processed first on machine A and then on machine B, and the order of the jobs is to be chosen. For the makespan (the finishing time of the last job), Johnson (1954) gave an exact sorting rule. For the sum (equivalently, the mean) of the completion times, no such rule is known: the problem is NP-hard in the…
Job Matching, Coalition Formation, and Gross Substitutes 6: When Workers Are Alike in Production, Gross Substitutes Is Equivalent to Nonincreasing Returns to WorkersResearch Paper
Kelso and Crawford's 1982 Econometrica paper studies a labor market in which firms hire sets of heterogeneous workers at individually negotiated salaries. Their existence results for the core and for competitive equilibrium, and the convergence of their salary-adjustment process, all rest on one hypothesis about each firm's technology, the gross-substitutes…
Monotone Comparative Statics I: The Argmax Is Monotone Nondecreasing in (t, S) If and Only If f Is Quasisupermodular in x and Has the Single Crossing Property in (x; t)Research Paper
An optimization problem often changes when a parameter changes: a price rises, a constraint expands, or a strategic environment shifts. Comparative statics asks whether the optimal choice moves in a predictable direction. The usual numerical tools, such as derivatives, can be unavailable when choices form a discrete set or the objective is neither smooth…
Potential Games 1: A Game Is an Exact Potential Game If and Only If I(γ, u) = 0 on Every Simple Closed Path of Length 4Research Paper
In a strategic game, each player evaluates a change in their own strategy using that player's own payoff. These incentives need not point in a common direction. A potential game is a case in which one real-valued function records every player's payoff change under a unilateral deviation. This common function lets questions about incentives be expressed as…
Large Deviations of Sums of Independent Random Variables 1: The Fuk–Nagaev Inequality P(S_n ≥ x) ≤ ΣP(X_i > y_i) + P_4, P_5 or P_6 for Truncated Moments of Order t ≥ 2Research Paper
How likely is a sum of independent random variables to exceed a large level x? If the summands have exponential moments, the classical answer is a Bernstein- or Hoeffding-type bound, exponentially small in x. Many quantities met in statistics, queueing, insurance mathematics and the analysis of algorithms have only finitely many moments, and then no…
Distributed Scheduling Based on Due Dates and Buffer Priorities 2: Under Last Buffer First Serve the Number of Parts Stays Bounded, Eventually by (λc(ε)+γ)/(1−ρ−λε)Research Paper
Semiconductor wafer fabrication lines are reentrant: a wafer returns to the same photolithography or etching station many times along its route, so the parts competing for a machine are at different stages of completion. In such a line, a local dispatching rule decides at every machine which waiting part goes next, and the question is whether a given rule…
Distributed Scheduling Based on Due Dates and Buffer Priorities 1: First Buffer First Serve Is Stable on Every Nonacyclic Flow Line Whose Bursty Arrival Rate Is Below CapacityResearch Paper
Semiconductor wafer fabs are the standard example of a reentrant manufacturing line: a wafer visits the same lithography or etching station many times along a route of hundreds of steps, so each station holds parts at many different stages of completion and must decide, every time a machine frees up, which of them to serve next. Kumar (Re-entrant lines,…
Monte Carlo Bounding Techniques for Determining Solution Quality in Stochastic Programs: The Expected Sample-Average Optimal Value Is a Lower Bound on z* That Improves with Sample SizeResearch Paper
Most stochastic programs that arise in practice, such as two-stage stochastic linear programs with recourse, have far too many scenarios to be solved exactly. The standard remedy is sample-average approximation: draw n independent observations of the random data, replace the expectation by the sample mean, and solve the resulting deterministic problem. A…
Flowshop and Jobshop Schedules: Complexity and Approximation 3: The Partition Job Shop on Two Machines Has a Schedule of Finish Time 5T, Preemptive or Not, Iff a Partition ExistsResearch Paper
A job shop is the basic model of a factory floor in which every job follows its own route through the machines. Minimizing the time at which the last job is finished (the finish time, or makespan) is one of the central problems of deterministic scheduling theory, and the question of which special cases admit efficient algorithms has organized much of the…
Multicommodity Max-Flow Min-Cut Theorems and Their Use in Designing Approximation Algorithms V: On a 3-Regular c-Expander the Uniform Max-Flow Is at Most 6𝒮/(c(⌊log n⌋ − 2))Research Paper
A multicommodity flow problem asks to route many source–sink demands through one capacitated network at the same time. Its min-cut (sparsest cut) is the smallest ratio, over all cuts, of the capacity crossing the cut to the demand separated by it. Routing is always limited by every cut, so the max-flow never exceeds the min-cut. For a single commodity the…
Globally Convergent Inexact Newton Methods II: Trust Region Limit Points Are Stationary Points of ‖F‖, and Near a Zero Where F′ Is Invertible the Full Newton Step Is Eventually TakenResearch Paper
Solving a system of nonlinear equations F(x)=0, with F:Rn→Rn continuously differentiable, is a basic task in numerical analysis and optimization: it is the inner step of interior-point and sequential quadratic programming methods, of implicit time-stepping for differential equations, and of equilibrium computations in operations…
Dynamic Instabilities and Stabilization Methods in Distributed Real-Time Scheduling of Manufacturing Systems 4: A Run-Truncating Priority-Queue Supervisor Keeps Every Buffer Bounded When ρₘ < 1Research Paper
A flexible manufacturing system routes several part types through a set of machines; a machine that switches from one kind of part to another must spend a set-up time first. Each machine has to decide, in real time and from local information only, which of its waiting buffers to work on and for how long. Long runs waste little time on set-ups but starve…
On Tail Probabilities for Martingales 2: For |X_n| ≤ 1 and E{X_n | ℱ_{n−1}} = 0, the Conditional Variance W_a Used to Cross a Satisfies E exp[−f(λ)W_a] ≥ exp[−λ(a+1)]Research Paper
Exponential tail bounds for sums of bounded martingale differences (Bernstein, Bennett, Hoeffding, Freedman) are the workhorses of probability, statistics and learning theory. They bound how far a martingale can travel in a given amount of conditional variance. The converse question is just as basic: how much conditional variance does a martingale need…
On the Generalized “Birth-and-Death” Process 3: Given the Mean Growth n̄_t, the Rates λ = (n̄′/n̄)⁺, μ = (n̄′/n̄)⁻ Uniquely Minimize Var(n_t) for All tResearch Paper
In a birth-and-death population model, an expected population curve does not determine the amount of random variation. Births and deaths can occur frequently while nearly canceling in the mean, or one of the two rates can vanish while giving the same mean. This distinction matters when a prescribed growth curve is used to model a population: two processes…
Distribution Function Inequalities for Martingales 8: For Concave Φ, EΦ(Σ z_k) ≤ 2·EΦ(Σ E(z_k | 𝒜_{k−1})) for Nonnegative z_kResearch Paper
A recurring task in martingale theory is to compare a sum of nonnegative random variables z1,z2,… with the sum of their predictable projectionsE(zk∣Ak−1): the conditional expectation of each term given the information available one step earlier. Such comparisons are the step that turns a statement about the conditional square…
Distribution Function Inequalities for Martingales 7: A Martingale of Bounded Mean Oscillation Satisfies E exp(tS²(f)) ≤ (1 − t)⁻¹Research Paper
A martingale can have individually well behaved increments while the sum of their squares remains large on rare sample paths. The square function records that accumulated variation. Bounds on its distribution tell probabilists how much a martingale can fluctuate even when a terminal value alone gives little pathwise information. In Section 19 of Distribution…
Distribution Function Inequalities for Martingales 9: EΦ(f*) Is Controlled by the Conditional Square Function and the Largest Jump, for Every Φ of Moderate GrowthResearch Paper
A martingale f=(f1,f2,…) is a sum of increments dk=fk−fk−1 each of which has conditional mean zero given the past. Most quantitative statements about martingales compare the size of the maximal functionf∗=supn∣fn∣ with some measure of the size of the increments. Two such measures are classical: the square functionS(f)=(∑kdk2)1/2,…
Distribution Function Inequalities for Martingales 6: For a Nonnegative Martingale, EΦ(S(f)) ≤ c·EΦ(f*) for Every Φ of Moderate GrowthResearch Paper
The square functionS(f)=(∑kdk2)1/2 of a martingale f with differences dk and its maximal functionf∗=supn∣fn∣ are the two basic size measures of a martingale. Inequalities comparing them, EΦ(S(f))≤cEΦ(f∗) and the reverse, are used throughout probability and harmonic analysis: they control stochastic sums by their…
Distribution Function Inequalities for Martingales 5: A Nonnegative Martingale's Square Function, Stopped Before |f_n| Exceeds λ, Is Exponentially Square IntegrableResearch Paper
Martingale estimates describe how a process built from successive, conditionally fair increments can fluctuate. A basic object is its square function: the square root of the sum of the squared increments along a sample path. Square functions are useful because they record accumulated variation even when positive and negative increments cancel in the…
Residual Life Time at Great Age 6: For 0 < ξ < α, Residual Life Attraction to Γ_α Is Equivalent to a Finite ξ-th Moment and E((X/t)^ξ | X > t) → (1 − ξ/α)^{−1}Research Paper
Actuaries, reliability engineers and demographers ask how much longer an item or a person will live given that it has already survived to a great age t. For a lifetime X with distribution function F, this is the law of the residual life timeX−t given X>t, and the question is what this law looks like as t→∞. Balkema and de Haan (Ann. Probab. 2…
Residual Life Time at Great Age 2: The Domain of Residual Life Time Attraction of the Exponential Law Is D(Λ) ∩ D₀Research Paper
A lifetime observed only after it has survived to a high age is described by its residual life: the additional time until failure, conditional on survival so far. Reliability analysis asks whether these conditional distributions settle into a stable shape after scaling and shifting. Extreme-value theory asks a related question about the largest observation…
Residual Life Time at Great Age 3: F Is in the Domain of Residual Life Time Attraction of Π_{p,c} iff It Is Tail Equivalent to a Discrete Law with Gap Ratios → e^{pc} and Tail Ratios → e^{−p}Research Paper
A component that has survived to age t has a residual life timeX−t, and in reliability, actuarial work and the analysis of excesses over high thresholds the question is what its conditional law looks like when t is large. Balkema and de Haan (Ann. Probab. 2 (1974), 792–804) answered this in full generality: after an affine normalization, the only…